Redbusbar IsolationPoint lockout procedure and management program

Thursday, 02 December, 2010 | Supplied by: Redbusbar Pty Ltd


The IsolationPoint lockout procedure and management program uses a PDA to execute energy isolation procedures to provide accurate and efficient equipment lockout.

Maintenance workers in mining and industrial sites typically address the risk of inaccurate isolations by having two people execute isolation procedures and crosscheck equipment identification, thereby avoiding mistakes. However, mistakes can still occur, as the approach is exposed to common-cause, trust or distraction-related failures. A difficulty is that modular plant design methods yield multiple process trains within the plant that appear identical. In addition, the use of long equipment identifiers can facilitate errors.

IsolationPoint comprises an isolation procedure library located on a PC and a handheld PDA as the means to execute isolation procedures. When required, an isolation procedure is scheduled for execution onto the PDA. The isolation officer then follows the isolation steps specified in the procedure and uses the PDA’s barcode or RFID scanner to verify isolation point identity. When the procedure is complete, time-stamped progress information is archived to the PC. Using this approach, the program enhances safety, uses fewer people and requires less administration.

Online: www.redbusbar.com
Phone: 07 3630 2112
Related Products

Siemens Sitop PDP6200 power supply for intralogistics

Siemens has expanded its power supply portfolio with the Sitop PDP6200, an IP65-rated solution...

Getac ZX10 fully rugged tablet

Getac has launched its next-generation ZX10 10″ fully rugged Android tablet, which combines...

Siemens Sitop PSU8400 and Sitop SEL1600 power supply system

The Sitop PSU8400 3-phase power supplies and Sitop SEL1600 selectivity modules can be...


  • All content Copyright © 2025 Westwick-Farrow Pty Ltd