Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Skill shortages and automation fears in field services and trade

Discover some surprising statistics on automation in your industry and learn how to successfully...

Advanced distribution management systems in the smart grid era

Learn how to implement ADMS into your network, manage your grids in real time and cut your costs.

Save up to 15% of your company’s annual fuel cost

Fuel is the largest fleet operating expense, so efficient fuel utilisation is essential for...


  • All content Copyright © 2025 Westwick-Farrow Pty Ltd