Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Buyer's guide to test and measurement equipment

This guide is designed to assist you in selecting and deciding on investment criteria for your...

Optimise field worker efficiency with mobile solutions

Mobile technology is now an essential component of every successful field service...

Your fleet is your canvas for maximising profits

Maintaining a fleet of vehicles, no matter how small, is considered a major operating expense...


  • All content Copyright © 2025 Westwick-Farrow Pty Ltd