Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Buyer's guide to test and measurement equipment
This guide is designed to assist you in selecting and deciding on investment criteria for your...
Optimise field worker efficiency with mobile solutions
Mobile technology is now an essential component of every successful field service...
Your fleet is your canvas for maximising profits
Maintaining a fleet of vehicles, no matter how small, is considered a major operating expense...