Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Retrofit your distribution grid by utilising local intelligent circuit breakers
The trend for refurbishment and extension of existing infrastructure in the distribution grid...
How to streamline your workflows with next-gen job management software
Discover how job management software can help you improve efficiency in your field service...
Top tips to avoid power quality disturbances
This paper reviews the most common types of power disturbances, what causes them and how to...